  • Construction is underway for the new Piatt Place Fire Station, marking an important milestone in the Town of Jupiter’s commitment to public safety. This new station will strengthen emergency services, reduce response times, and provide cutting-edge resources for our firefighters. Follow along as we document the construction process, from groundbreaking to completion, and prepare to welcome a fully equipped station ready to serve the community for years to come.
  • Construction Update – February 2026

  • Updated February 12, 2026
  • Construction at the Piatt Place Fire Station continues to move forward, with significant progress on site work, building systems, and interior finishes.
  • The first lift of asphalt has been completed on the parking lot to the north of the station, and grading for the south apron is now underway. Foundations for two mast arms have also been installed; these mast arms will assist fire apparatus in safely exiting the property.
  • Preparations for permanent power are complete, and the building has been fully prepped for Florida Power & Light (FPL) to provide electrical service. The generator pad has been formed and is awaiting a concrete pour.
  • Inside the facility, painting is currently in progress on both floors, and fans have been installed in the apparatus bay as interior systems and finishes continue to advance.

Piatt Place Progress Highlights

  • First lift of asphalt completed on the north parking lot; grading underway for the south apron
  • Foundations installed for two mast arms to assist fire apparatus exiting the site
  • Building fully prepped for FPL power connection
  • Generator pad formed and awaiting concrete pour
  • Painting in progress on both floors
  • Apparatus bay fans installed

Watch the latest construction update here

Piatt Place Fire Station Drone Timelapse Video – 01/08/26