News Flash

Roads and Construction Projects

Posted on: March 13, 2019

Lagoon Bridge Repairs

7-x-10-quot-metal-sign-area-closed-to-pedestrians-vintage-look-reproduction-quot-cd75db700a6e7044488

Beginning on March 20, 2019, a contractor will be completing the Lagoon Bridge Repairs.

The project includes but is not limited to concrete repair, spray deck installation, painting, and joint sealing.  Throughout the duration of the project, the northern portion of the bridge between the Best Western and the Jupiter Yacht Club Marina will be closed to pedestrian traffic.  All pedestrian traffic will be required to walk along US Highway 1 in order to connect to the Jupiter’s Riverwalk.  The work is estimated to take approximately 75 days; the construction schedule is weather dependent. If you have any questions about the project, please contact the Engineering Division Administrative Specialists at 561-741-2372 or 561-741-2467.

Facebook Twitter Email

Other News in Roads and Construction Projects

No-Parking-Sign-K-5680

Sawfish Bay Park Restroom

Posted on: February 7, 2019
construction ahead

Jones Creek Preserve Project

Posted on: February 7, 2019
lane closure

Maplewood Drive Lane Closures

Posted on: January 22, 2019
road_work_ahead-sign

Center St. Roadway Improvements

Posted on: November 27, 2017