Under Construction

Pine Gardens South Water Distribution Improvements (W1505)


Project Status: Under Construction
Project Value: $165,562.90

Description: Installation of approximately 2,220 linear feet of water main, replacement of 13 fire hydrants, the installation/replacement of approximately 22 isolation valves, and surface restoration throughout the Pine Gardens South neighborhood.

Contact: Steven Montemayor, Utilities Engineer, email or call 561-741-2710

Heights of Jupiter End Wall Installations & Rehabilitations (S1502B)


Project Status: Under Construction
Project Value: $183,108.85

Description: The drainage system (stormwater pipes, culverts, catch basins, and end walls) in the Heights of Jupiter are owned and maintained by the Town of Jupiter Stormwater Utility. This project will install five new concrete end walls and replace five existing rip rap end walls with concrete. The ten (10) concrete end walls specified in this contract to be installed/rehabilitated will restore the right-of-way stormwater management system to design conditions and eliminate erosion of canal banks around the end walls.

Contact: Steven Montemayor, Utilities Engineer, email or call 561-741-2710

Heights of Jupiter Location Map (S1502)

Well Rehabilitation Program (W1614)


Project Status: Under Construction

Description: Well rehabilitation services for the Town's Floridan and Surficial Aquifer water supply wells. Work under this contract may include both emergency and non-emergency well rehabilitation services and repairs.

Contact: Rebecca Wilder, Assistant Facilities Manager, email or call 561-741-2635

Utilities Painting Maintenance (W1604)


Project Status: Under Construction

Description: Painting of various water and stormwater utility facilities, including but not limited to, concrete ground storage tanks, steel tanks, interior and exterior of concrete block structures, chemical containment areas and chemical rooms, fiberglass structures, equipment, pipe, pumps, motors, and other facilities,

Contact: Brad Wagner, Senior Utility Engineer, email or call 561-741-2589

North Jupiter Distribution System Improvements - Phase II (W0327A)


Project Status: Under Construction
Project Value: $2,096,249.50

Description: Localized fire protection and aging infrastructure issues will be addressed when back yard water mains, old valves, and hydrants are replaced east and west of Seabrook Road. Valves and hydrants on existing watermains in road right-of-ways will be replaced and additional valves will be installed for better isolation of the distribution system.

Contact: Amanda Barnes, Assistant Director of Utilities, email or call 561-741-2537

N Jupiter Distribution System Improvements Location Map W0327A